The list below is not an exhaustive list of projects, roles, expertise or experience. Some projects worked on are confidential.


 

 

 

 

Project or role Description

Location

Notes

Isle of Man Spur Pipeline

12km 10 inch natural gas subsea pipeline branching off the Second Scotland-Ireland Interconnector (IC2) to supply natural gas to the Isle of Man

Ireland, UK and Isle of Man

Negotiated suite of construction and underwriting agreements for the gas spur pipeline to the Isle of Man including the 87MW MEA Pulrose 2 x GE LM2500 CCGT Project value was STG 48m (2002 money). Project financed on a non-recourse basis to separate from core Irish business and associated credit rating

Corrib Linkline

160km 26 inch pipeline to connect the Corrib gas field to the Irish gas grid

Ireland

Negotiated the commercial arrangements, underwritten by take-or-pay contracts with the Corrib partners by innovative `stand-alone` Regulated Asset Base (RAB). ( EUR220m, 2006 money).Financed through corporate treasury funding.

 

Gas to towns supplied via the Corrib Linkline

Ireland

Developed commercial arrangements to supply 14 new towns and associated industries off the Corrib Linkline

Corrib Linkline Renegotiation

 

Ireland

Renegotiation of the Corrib agreements after production first gas delays.

Renegotiated the payment start-date and arrangement s to allow the pipeline to be connected to the gas grid to supply the 14 towns connected.

 

Northern Ireland Pipelines contractual framework to underwrite construction of pipeline network in Northern Ireland and to connect it to Irish gas network

Ireland

and

Northern Ireland

Negotiated the arrangements to connect Derry/Londonderry and link the gas networks north and south, underwritten by a take-or-pay contract with the GE MS9001FB 430 MW Coolkeeragh CCGT. Project values STG175m (2003 money). Project was financed through corporate treasury funding, a EUR250m European Investment Bank facility, a STG38m Northern Ireland Executive capital grant and an EUR8.5m Irish Government contribution.

Distribution Spur pipelines to 10 towns Northern Ireland

Commercial arrangements to underwrite spur pipelines to 10 towns in Northern Ireland

Northern Ireland

Developed commercial framework to allow construction of spur pipelines to 10 towns off the Northern Ireland transmission pipelines for Firmus Distribution to distribute and supply gas to 10 towns

Northern Ireland Transmission Pipelines Licence and Regulatory Contract

Ireland

and

Northern Ireland

Negotiation and implementation of the regulatory contract to allow BGE recover the investment on the Transmission pipeline Assets

The Belfast to Coolkeeragh (North-West) Pipeline and Dublin to Belfast ( South-North) Pipeline.

The BGE(Northern Ireland) pipelines investments were recovered over 20 year period via a very innovative regulatory contract or Licence. A system of postalised transmission tariffs was developed to allow 3 separate pipeline owners recover their investment via a single Northern Ireland Transmission Regulated Asset base.

 

FIDIC Red Book Northern Ireland pipeline

construction contracts

Ireland

and

Northern Ireland

Negotiation of pipeline construction contracts which traditionally used Institution of Civil Engineers (ICE)General Conditions.

Implementation of best international practice using FIDIC.

Negotiated buyout of unforeseen ground conditions under ICE General Conditions Clause 12 or FIDIC red book

Clause 4.12. In standard forms of the FIDIC Red Book and the ICE Conditions of Contract, the risk of unforeseen ground conditions sits squarely with the Employer. A buyout was negotiated with the Contractors via Particular Conditions modifications to make it somewhat similar to Silver Book

FIDIC Red Book

Contract for live gas connection to Belfast Transmission network

Ireland

Negoatated a and managed tie-in and connection to existing high pressure gas network in Northern Ireland. T.D. Williamson (TDW) high-pressure Stopple technology and high-pressure hot tapping systems used)

First time used on island of Ireland for live high pressure transmission line using this technology.

Heat Networks Diversification

New Business Development

Ireland

Developed a proposal to diversify from gas networks into heat networks with the potential of creating a new regulated asset base of EUR3.4bn to EUR4bn to supplement and ultimately replace GNI`s gas network Regulated Aset Base of EUR1.8bn in 2025. This proposal is based on applying the Regulated Asset Base Model to heat networks. This is also being progressed by state owned gas TSO`s throughout Europe including Gasunie under their Warmtelinq project

Gas Transportation Contract Framework Development Management

 

Ireland

and

Northern Ireland

Development Manager and Programme Manager for the team that designed and implemented the commercial framework for gas transportation across Ireland, North and South.

Build and lead cross-functional teams

Developing regulated and unregulated new business opportunities that leverage GNI's infrastructure expertise in the transition to a low-carbon economy and net zero

Ireland

Identify and develop opportunities in hydrogen, heat networks, new gas supply sources, and biomethane for heat and transport.

Demand side: grow renewable gas in power generation and heat, and develop new opportunities in transport (gas supplies 30% of Ireland's primary energy, including 50% of power generation and 38% of heat).

Supply side: decarbonise the gas network through renewable gases and diversify and strengthen security of gas supply.

 

Green Hydrogen Blending

And conversion of B/E class gas turbine to hydrogen blends

Ireland

Developed a proposal to transport and supply green hydrogen from surplus curtailed renewables, blended with natural gas, and to repurpose a redundant section of the gas network for hydrogen storage. Investigated potential to convert one of the 3 MS9001B ( PG9161B) gas turbines at Aghada to green hydrogen blends using new FlameSheet combustion hardware

New innovative gas transportation services for Irish market

Ireland

Led the team and developed commercial arrangements for new innovative services to the Irish market, these included including; onshore linepack storage services, short-term and interruptible transportation services

 

EU Infringements

Ireland

Northern Ireland

and

UK

Led the team and developed commercial arrangements to address EU Infringement notice issued to Irish Government and UK Government for non- compliance with requirements of EU Gas Directives and Regulations

Change Management

Change management project for single contract out-sourced model

 

Ireland

Implementation of the new Single Period Contract, including quality assurance of contracted works.

 

Led a major change management programme to make management systems and processes fit for purpose in a new outsourced environment, ensuring compliance with legal and regulatory licence requirements. Worked at senior level with regulators and government bodies to address incidents and prevent recurrence of non-compliances.

Seven Heads Gas Field

New Production Gas Grid Entry Point

Ireland

Developed the contractual framework that brought the new Seven Heads offshore gas field. Developed innovative contractual arrangements for the Seven Heads field using existing grid entry point infrastructure;

Middleton Gas Compressor station refurbishment

Ireland

Negotiated the contract and commercial arrangements for the refurbishment of Midleton compressor station for south-to-north flows to facilitate a new Seven eads gas field development.

Works underwritten by a send or pay a contract with gas field developer

 

Commercial offshore Storage service South West Kinsale gas field

Ireland

Developed new innovative commercial arrangements for gas entry and back-haul (virtual gas exit) for a new offshore storage facility developed at South West Kinsale gas field

Kinsale Area Gas Sales and Re-profiling Agreement

Ireland

Re-negotiation of the Kinsale Area Production and Re-profiling framework with Marathon

Separation of gas supply and gas transportation elements to comply with EU Unbundling Legislation in First ags Directive

Commercial and Technical Advice on gas turbine upgrade

 

Sabic Ibn Zahr KSA

Troubleshooting and controls modifications to innovative petrochem plant at Sabic Ibn Zahr KSA. This is an MTBE plant using MS5002 gas turbine exhaust directly as process catalyst heat source, including as a high temperature heat source for re-generation of the catalyst bed.

Commercial advice on options to upgrade Speedtronic Mk II control system

Commercial advice on options to upgrade Speedtronic MkIV control system on MS6001B used for power gen at same location

FIDIC Contracts Specialist and Contracts Manager on power generation and gas turbine installation, maintenance and upgrade projects

 

Multiple

Multiple clients and locations including Shanahan Engineering ( now Ethos Energy), serving the power generation and oil and gas sectors.

 

FIDIC Contracts Specialist; power generation EPC contracts

MHI

Takasago

Japan

Commercial and technical advice on successful resolution of multiple warranty and associated claims at multiple sites under FIDIC Silver Book EPC framework

Biomethane in Transport

New Business Development

Ireland

Organised Ireland`s first zero carbon bus journey which took place on Monday, 25th March 2019, which was featured prominently in national print and broadcast media

See links;

https://www.southernstar.ie/news/zero-carbon-bus-makes-its-first-journey-from-city-to-ringaskiddy-4172283

 

https://www.rte.ie/news/environment/2019/0325/1038431-green-bus-trial/

 

Route: From Lapp's Quay in Cork City to the MaREI (Marine and Renewable Energy) research centre in Ringaskiddy

Technology: A biomethane-powered ("biogas") bus running on renewable gas generated from agricultural and food industry waste

Passengers on Board: Representatives from Cork Chamber, Energy Cork, and the MaREI / UCC research center.

Bio LNG and reduction of boil-off gas flaring

Ireland

Developed proposal for bio-LNG supply to off gas grid users in north-west Ireland

Industrial sites would be supplied via backhaul indigenous biomethane into LNG Terminal. This would also reduce Boil Off Gas (BOG) flaring

440MW CCGT IPP project under FIDIC Silver Book

Ireland

Commercial and technical advice on 440MW CCGT IPP - project value EUR407 million.

Financed by European Investment Bank (EIB) Loan of EUR200 million in direct project finance/long-term debt

The remaining EUR200 million was financed directly by the developer`s corporate resources and commercial borrowings underwritten by a state backed by utility balance sheet.

Plant construction under FIDIC Silver Book began in March 2008 and was completed on budget and entered commercial operations in late 2010.

Plant consists of a GE Frame 9FB (PG9371FB) gas turbine on a single-shaft configuration with GE A15 steam turbine with a SSS clutch driving a GE 450H generator.

Steam raised in CMI Energy Heat Recovery Steam Generator

The plant features several Innovative Features

Supplementary Firing; in post-combustion duct burner system designed to fire natural gas or Refinery Off-Gas (ROG) supplied directly from an adjacent oil refinery

Industrial Cogeneration; facility to export up to 50 tonnes per hour of high-pressure process steam (at 45 barg) across fence to an adjacent oil refinery

GE 450H synchronous condenser:

Generator can be configured to operate as a synchronous condenser plant can accommodate modification for a separate SSS clutch to decouple the generator.

Reliability Excellence; a new advanced software solution which taps into industrial-scale data analytics to predictively identify operational issues before they occur.

 

Non OEM LTSA from

Independent Service Provider (ISP)

Multiple

International locations

Commercial and technical advice on evaluating and negotiation of multi-year gas turbine LTSA. Facilitated transition from an Original Equipment Manufacturer (OEM) to a tier-1 Independent Service Provider (ISP)

Savings delivered typically 20% to 35% over OEM LTSA

Developed commercial arrangements for migration of one of the first OEM LTSAs to ISP LTSA at a power and desalination plant in Abu Dhabi UAE.

Negotiated contract with non-OEM LTSA service provider

Negotiated certified refurbished parts supply contract for 8 x MS9001E ( PG9171E) gas turbines which was wrapped with non OEM LTSA, in a fully transparent, flexible and highly re-negotiable contract

 

Dispatchable back-up and peaking power plant generation capacity

Ireland

Commercial and technical advice on developing peaking power plants to support intermittent renewable generation.

Proposal for 90MW developed based on 2 re-located MS6001B gas turbines. This proposal was subsequently successfully implemented by a competitor.

Proposal then developed for 200MW of fast response generation capacity based on re-located LM2500 and LM600 aeroderivative gas turbines.

This proposal was subsequently successfully implemented by the grid operator as the Temporary Emergency Generation (TEG) project.

 

Gas Compression & Flare Reduction

Cabinda Gulf Oil Company (CABGOC) a subsidiary of Chevron

Cabinda

Angola

Commercial and technical advice on refurbishment and upgrading of Waukesha L7042GSI engines with upgraded ESM2 control system. These are heavy duty V16 uniquely engineered to run directly on variable-quality `field gas` or raw well gas in Cabinda's oilfields. This fuel flexibility allows CABGOC capture and utilise associated gas to run heavy duty field pumps and generators rather than flaring it

Absorption refrigeration feasibility study

Ireland

Feasibility study into Trigeneration (CHP with absorption refrigeration) for electronics manufacturing company

Boiler economiser retrofit feasibility study

Ireland

Feasibility study into retrofitting a 16T flame tube boiler with an economiser

Combined Cycle Gas Turbine Fuel System Re-Calibration

Speedtronic Mk IV

Edison Thermoelectrical Marghera, Venezia, Italy

Troubleshooting fuel valve position fault on start-up. MS 9001E (PG9171E) gas turbine servo valve replacement and fuel system recalibration

Re-configure spinning reserve control constants

CHP feasibility Study including feasibility of IGCC with wood waste as fuel

Ireland

CHP feasibility study for modern wood processing plant. Payback analysis based on using natural gas in CHP plant instead of wood waste in existing water tube boilers.

Alternative integrated gasification combined cycle (IGCC) CHP plant with wood waste as fuel

Conversion of Boilers from heavy fuel oil (HFO) to natural gas

Ireland

Design of gas distribution system. Preparation of tender specification for pressure reduction and regulation equipment. PID review, pipework design and sizing.

Design of boiler-house gas detection system

Combined Heat and Power (CHP) Feasibility Study

Ireland

CHP Feasibility study for modern food manufacturing plant, electrical demand 3 MW(e)

Project Value Euro 2.5m

Preparation of Proposal for 15-year maintenance contract for the Dublin Port Tunnel facility

Ireland

Preparation of a detailed proposal for the 15-year maintenance contract for the mechanical and electrical equipment

Project Management, installation and start-up of 1 x Cochran Thermax 16T Boiler with low NOx burner, economiser, O2 trim and VSD FD Fan

Ireland

Specification, preliminary design, tender, detail design, and project management of installation and commissioning of new 16T boiler. Project value Euro 712 K

5 MW(e)Combined Heat and Power (Cogeneration) Project;

Ireland

Completed detailed CHP feasibility study, and produced conceptual design models for possible 5 MW (e) integrated CHP plant.

Project Value Euro 9.15 M

Comprehensive Site Energy Survey and Energy Audit

Ireland

Comprehensive Energy Audit and Energy Survey carried out to CIBSE AM5 1991 - Energy Audits and Surveys

Project to establish unit costs for all site energy and utilities usage.

Ireland

Pharmaceutical plant energy use survey in preparation for energy market de-regulation.

Retrofit of 349kW(ref) Refrigeration plant with R134a

Ireland

Technical evaluation of all retrofit options Project value Euro 305 K.

Installation of 530 kW(ref) NH3 Refrigeration plant

Ireland

Specification of new plant

Project value Euro 800K

Installation of 400 kW(ref) NH3 Refrigeration plant

Ireland

Design of tie-ins to existing plant Project value Euro 661K

Feasibility Study on drop in HFC, HCFC and HC replacement gases for R12 and R22 for large industrial refrigeration plant.

Ireland

Evaluation of all possible retrofit options for a 430kW(Ref) R12 Sulzer refrigeration plant with a centrifugal compressor

Feasibility Study and lifecycle cost analysis of 500kW(ref) absorption refrigeration plant

Ireland

Absorption refrigeration at -25oC using gas turbine exhaust waste heat.

Done as follow on from a CHP feasibility study.

Feasibility study on Waste Water Treatment Plant sludge drying using Gas Turbine exhaust waste heat.

Ireland

Study done to evaluate ways of making the subject plants thermal and electrical load profile more suitable for CHP

Feasibility study and preliminary design of system to process solvent waste as boiler fuel using existing equipment on site.

Ireland

Project to determine the feasibility of burning high calorific value waste process solvent in a planned future gas turbine waste heat recovery boiler, or in an existing gas fired flame tube boiler.

Feasibility study on centralised refrigeration plant incorporating ice / eutectic storage and waste heat powered absorption refrigeration.

Ireland

Energy reduction option in a large chemical plant with a high process cooling load at -20oC i.e. average cooling load of 3,150 kW (Ref.)

Project to commission an auto-sequence control system on four 530kW refrigeration plants.

Ireland

Project value Euro 44,430 achieving annual savings of Euro 102,922.

Auto sequencing of start-up and shutdown avoiding part load operation on screw compressors.

Development and implementation of Targeting and Monitoring system (STARK system).

Ireland

Implementation of energy target and monitoring system in a large pharmaceutical plant using existing infrastructure i.e. existing computer LAN

Replacement of 12" process piping headers

Ireland

Short turn-around replacement of 160m of 12" process piping header.

Project value Euro 228,563

Reverse Engineering Repair procedure for cast iron axial pump casings

Ireland

Unit Repair cost Euro 1,525 New item cost Euro 8,895 each

Reverse Engineering Repair procedure for cast iron large tank rake drive bull gear

Ireland

Material analysis and development of repair procedure for cast iron gear.

Reverse Engineering Repair and material selection for pump shaft, bearing and seal bushings

Ireland

Cost savings of Euro 6,362 per year per unit

Pump Selection - replacement of high maintenance multistage gear pumps with more robust centrifugal items

Ireland

Repair cost savings of Euro 5,000 per year per unit

Pump and line sizing for various fluids including viscous slurries

Ireland

Pump selection taking into account capital cost, lifecycle costs including energy efficiency and maintenance costs, and ease of installation.

Development of repair procedures for ASME VIII pressure vessels

Ireland

Pressure vessels damaged by stress corrosion cracking.

All repairs to ASME VIII

Development of repair procedures for API 650 / API 653 storage tanks

Ireland

Erosion and corrosion damage, all repairs to API 653

ABB Camlica Hydro Electric Power Plant Constructability review

ABB,

Birr, Switzerland

Preparation of tender packages for issue to local mechanical and electrical contractors for the Camlica HEPP, Turkey.

Petrofina Angola.

Re-furbishment and upgrade of the Pangala Gas Lift Station

3 x Waukesha L740GSI gas engines and 3 x Ingersoll Rand 4RDS-3 reciprocating compressors

Ireland /

Soyo, Angola

Project value US$ 3.6 m

Complete overhaul and upgrade of gas lift facility to provide re-injection for the Perofina / Sonangol Pangala and Quinguila on-shore fields

Mitsubishi Heavy Industries (MHI) Parana 535MW(e) Combined Cycle power Plant 4 x MW 701F

Ireland

Development of tender packages for local Argentinean mechanical and electrical erection contractors

Mitsubishi Heavy Industries (MHI)

Una CCGT 1 x MW 701DA - Warranty Items

Maasvlakte, Holland / Ireland

Low Btu blast furnace gas fuelled unit

Technical advice on resolution on miscellaneous warranty / punch-list items

Mitsubishi Heavy Industries (MHI) Saltend - Contract Management of consortium partner subcontractor claims 3 x MW 701FA

MHI,

Takasago, Japan

Investigation and settlement of disputes relating to scope split in consortium agreement

Long term Maintenance Barking Power Station 5x MS 9001E CCGT

Ireland / UK

Proposal for long-term maintenance contract for gas turbines including repair of hot gas path parts by Wood Group

Preparation of proposal for the erection and commissioning of 1xGE Stag 106FA

Ireland

RWE Opel IPP Germany

GE Fife Energy 1x MS 9001FA - Subcontractor pre-qualification and selection, Pre-bid meeting and site survey

Ireland / Fife, Scotland

IPP on Scottish Coal gasification site Fife Scotland

Austrian Energy Poolbeg 2 x HRSG for Seimens V94.2 conversion to combined cycle.

Ireland

Feasibility study into Austrian Energy boiler tube bundle module fabrication in Ireland.

Sourcing of suitably qualified craft labour,

Establish costs, and finding suitable locations for the job.

MS 5001M Shop refurbishment, including Major Overhaul and control system upgrade and refurbishment

Speedtronic Mk I control system

GE Service Shop, Jacksonville, Florida, USA

Power block unit conversion to stand alone unit

MS 5001K Fuel Regulator re-calibration and start-up

Spain.

Haagen temperature control

MS 5001N Combustion Inspection,

Spain.

Combustion inspection on heavy fuel oil fired unit

MS 5001N Speedtronic Mk II Control system re-calibration and modifications

Spain.

Addition of BOP contact inputs and outputs. Back-plane wiring mod.s for new sequencing.

MS 5001K Fuel Regulator Control system retrofit

Spain.

Haagen to Temcon I temperature control retrofit

MS 6001B Installation and Mk IV Speedtronic Start-up,

Rhode Island, USA.

IPP Plant - Pawtuckett Power

MS 5001MSpeedtronic Mk I

re-calibration and start-up,

Springville, Mass., USA

Unit start-up after major overhaul

MS 5000 Parts Interchangeability Study, and Spare Rotor Program,

GE Service Shop

Basildon, UK

Study into interchangeability of rotor parts between different model MS 5001 and also MS 5002 to improve GE rotor exchange service

3 x MS 9001E Exhaust Damper retrofit and exhaust plenum modifications

Abu Dhabi, UAE.

Project included retrofit of internal insulation and cladding to GT - Boiler exhaust duct.

MS 9001E Bearing Inspection,

Abu Dhabi, UAE.

Fast turn-around bearing inspection, all bearings removed without removing the GT rotor.

MS 5002B Speedtronic Mk II to Speedtronic Mk IV Simplex retrofit troubleshooting

QGPC, PS3, Qatar.

AEG Packaged Frame 5

GT installed in Zone 2 enclosure.

Compressor drive.

MS 5001E Fuel regulator re-calibration, troubleshooting and start-up,

Valentia, Venezuela.

Re-located unit providing heat and power for a paper mill in Venezuela

MS 9001E (PG 9171E) Exhaust Damper Retrofit and Speedtronic Mk IV+ control system

Abu Dhabi, UAE.

Project to integrate the control of waste heat recovery boilers with Mk IV control system.

GT Exhaust damper interlock sequencing moved from boiler control system to GT control system

MS 9001E (PG 9171E)

Site residency, Combustion Inspections.

Control System Speed Mk IV +

Abu Dhabi, UAE

One of the first Mk IV+ sites.

MS 5001K Major overhaul and Control System re-calibration of with Fuel Regulator control system

ALPART Jamaica

GE MAC temp. control

De-mothballing and commissioning of 6 x LM2500s with Speedtronic Mk IV control systems.

Marjan GOSP 2, Marjan Field. Arabian Gulf, KSA.

Marjan GOSP 2 - the largest offshore gas compression platform in the world when built. Full output of 600 MMSCFD (million standard cubic feet per day) gas at 535 psi (36 Bar), 350,000 BPD (barrels per day) Oil

Start-Up 1 x MS 6001B Speedtronic Mk IV+ control system.

Port Harcourt, Nigeria.

Project to provide power for the NNPC / Shell Pt Harcourt LNG terminal

Major Overhaul and control system modifications MS 9001E (9171E) with Speedtronic Mk IV controls.

Abu Dhabi, UAE.

Al Taweelah UAE, one of the largest power and desalination plants in the middle east.

MS 9001E (9151E) Hot Gas Path inspection, Major Overhaul and control system re-calibration, Speedtronic Mk II with ITS control system

Beersheba, Israel.

Hot gas path inspection developed into major inspection and removal of compressor stator vanes due to FOD

Start-up MS 9001E (9171E) with Speedtronic Mk V control system.

Port Dickson, Malaysia

One of the first IPPs in Malaysia. The first IPP to synchronize with the grid.

Fast track construction schedule

Start-up of 1 x MS 6001B with Speedtronic Mk V control system.

Miri, Malaysia

Fast track start-up of simple cycle GT unit in power starved area of northern Sarawak (Borneo).

Project value US$ 16M.

Mk V controls troubleshooting on full load string test of LM 6000 Speedtronic Mk V Control system

Nuovo Pignone, Massa, Italy

First Nuovo Pignone packaged LM 6000.

First LM 6000 with Mk V and Woodward fuel system. Generator drive for offshore application with Hamilton Oil UK.

Resolution of warranty items on 1 x MS 6001B installation, mechanical and controls, Speedtronic Mk V and Historian

Miri, Malaysia

Resolution of punch-list items and problems with integration of new 35 MW Frame 6 with existing 16 smaller GTs (3MW to 12 MW) on the power grid.