Isle of Man Spur Pipeline 12km 10 inch natural gas
subsea pipeline branching off the Second Scotland-Ireland Interconnector
(IC2) to supply natural gas to the Isle of Man |
Ireland, UK and Isle of Man |
Negotiated suite of
construction and underwriting agreements for the gas spur pipeline to the
Isle of Man including the 87MW MEA Pulrose 2 x GE LM2500 CCGT Project value
was STG 48m (2002 money). Project financed on a non-recourse basis to
separate from core Irish business and associated credit rating |
|
Corrib Linkline 160km 26 inch pipeline to
connect the Corrib gas field to the Irish gas grid |
Ireland |
Negotiated the commercial
arrangements, underwritten by take-or-pay contracts with the Corrib partners
by innovative `stand-alone` Regulated Asset Base (RAB). ( EUR220m, 2006
money).Financed through corporate treasury funding. |
|
Gas to towns supplied via
the Corrib Linkline |
Ireland |
Developed commercial
arrangements to supply 14 new towns and associated industries off the Corrib
Linkline |
|
Corrib Linkline
Renegotiation |
Ireland |
Renegotiation of the
Corrib agreements after production first gas delays. Renegotiated the payment
start-date and arrangement s to allow the pipeline to be connected to the gas
grid to supply the 14 towns connected. |
|
Northern Ireland Pipelines contractual framework to underwrite construction of pipeline network
in Northern Ireland and to connect it to Irish gas network |
Ireland and Northern Ireland |
Negotiated the arrangements
to connect Derry/Londonderry and link the gas networks north and south,
underwritten by a take-or-pay contract with the GE MS9001FB 430 MW
Coolkeeragh CCGT. Project values STG175m (2003 money). Project was financed
through corporate treasury funding, a EUR250m European Investment Bank
facility, a STG38m Northern Ireland Executive capital grant and an EUR8.5m
Irish Government contribution. |
|
Distribution Spur
pipelines to 10 towns Northern Ireland Commercial arrangements to
underwrite spur pipelines to 10 towns in Northern Ireland |
Northern Ireland |
Developed commercial
framework to allow construction of spur pipelines to 10 towns off the
Northern Ireland transmission pipelines for Firmus Distribution to distribute
and supply gas to 10 towns |
|
Northern Ireland
Transmission Pipelines Licence and Regulatory Contract |
Ireland and Northern Ireland |
Negotiation and
implementation of the regulatory contract to allow BGE recover the investment
on the Transmission pipeline Assets The Belfast to
Coolkeeragh (North-West) Pipeline and Dublin to Belfast ( South-North)
Pipeline. The BGE(Northern Ireland)
pipelines investments were recovered over 20 year period via a very
innovative regulatory contract or Licence. A system of postalised
transmission tariffs was developed to allow 3 separate pipeline owners
recover their investment via a single Northern Ireland Transmission Regulated
Asset base. |
|
FIDIC Red Book Northern Ireland pipeline construction contracts |
Ireland and Northern Ireland |
Negotiation of pipeline construction contracts which traditionally
used Institution of Civil Engineers (ICE)General Conditions. Implementation of best international practice using FIDIC. Negotiated buyout of unforeseen ground conditions under ICE General
Conditions Clause 12 or FIDIC red book Clause 4.12. In standard
forms of the FIDIC Red Book and the ICE Conditions of Contract, the risk of
unforeseen ground conditions sits squarely with the Employer. A buyout was negotiated
with the Contractors via Particular Conditions modifications to make it
somewhat similar to Silver Book |
|
FIDIC Red Book Contract for live gas connection to Belfast Transmission network |
Ireland |
Negoatated a and managed tie-in and connection to existing high
pressure gas network in Northern Ireland. T.D. Williamson (TDW) high-pressure
Stopple technology and high-pressure hot tapping systems used) First time used on island
of Ireland for live high pressure transmission line using this technology. |
|
Heat Networks
Diversification New Business Development |
Ireland |
Developed a proposal to
diversify from gas networks into heat networks with the potential of creating
a new regulated asset base of EUR3.4bn to EUR4bn to supplement and ultimately
replace GNI`s gas network Regulated Aset Base of EUR1.8bn in 2025. This proposal
is based on applying the Regulated Asset Base Model to heat networks. This is
also being progressed by state owned gas TSO`s throughout Europe including
Gasunie under their Warmtelinq project |
|
Gas
Transportation Contract Framework Development Management |
Ireland and Northern Ireland |
Development Manager and
Programme Manager for the team that designed and implemented the commercial
framework for gas transportation across Ireland, North and South. |
|
Build and lead
cross-functional teams Developing regulated and unregulated
new business opportunities that leverage GNI's infrastructure expertise in
the transition to a low-carbon economy and net zero |
Ireland |
Identify and develop
opportunities in hydrogen, heat networks, new gas supply sources, and
biomethane for heat and transport. Demand side: grow
renewable gas in power generation and heat, and develop new opportunities in
transport (gas supplies 30% of Ireland's primary energy, including 50% of
power generation and 38% of heat). Supply side: decarbonise the
gas network through renewable gases and diversify and strengthen security of
gas supply. |
|
Green Hydrogen Blending And conversion of B/E
class gas turbine to hydrogen blends |
Ireland |
Developed a proposal to
transport and supply green hydrogen from surplus curtailed renewables,
blended with natural gas, and to repurpose a redundant section of the gas
network for hydrogen storage. Investigated potential to convert one of the 3
MS9001B ( PG9161B) gas turbines at Aghada to green hydrogen blends using new FlameSheet combustion hardware |
|
New innovative gas
transportation services for Irish market |
Ireland |
Led the team and developed
commercial arrangements for new innovative services to the Irish market,
these included including; onshore linepack storage services, short-term and
interruptible transportation services |
|
EU Infringements |
Ireland Northern Ireland and UK |
Led the team and
developed commercial arrangements to address EU Infringement notice issued to
Irish Government and UK Government for non- compliance with requirements of
EU Gas Directives and Regulations |
|
Change Management Change management project
for single contract out-sourced model |
Ireland |
Implementation of the new
Single Period Contract, including quality assurance of contracted works. Led a major change
management programme to make management systems and processes fit for purpose
in a new outsourced environment, ensuring compliance with legal and regulatory
licence requirements. Worked at senior level with regulators and government
bodies to address incidents and prevent recurrence of non-compliances. |
|
Seven Heads Gas Field New Production Gas Grid
Entry Point |
Ireland |
Developed the contractual
framework that brought the new Seven Heads offshore gas field. Developed
innovative contractual arrangements for the Seven Heads field using existing
grid entry point infrastructure; |
|
Middleton Gas Compressor
station refurbishment |
Ireland |
Negotiated the contract
and commercial arrangements for the refurbishment of Midleton compressor
station for south-to-north flows to facilitate a new Seven eads gas field development. Works underwritten by a
send or pay a contract with gas field developer |
|
Commercial offshore
Storage service South West Kinsale gas field |
Ireland |
Developed new innovative
commercial arrangements for gas entry and back-haul (virtual gas exit) for a
new offshore storage facility developed at South West Kinsale gas field |
|
Kinsale Area Gas Sales and
Re-profiling Agreement |
Ireland |
Re-negotiation of the
Kinsale Area Production and Re-profiling framework with Marathon Separation of gas supply
and gas transportation elements to comply with EU Unbundling Legislation in
First ags Directive |
|
Commercial
and Technical Advice on gas turbine upgrade |
Sabic Ibn Zahr KSA |
Troubleshooting
and controls modifications to innovative petrochem plant at Sabic Ibn Zahr KSA.
This is an MTBE plant using MS5002 gas turbine exhaust directly as process
catalyst heat source, including as a high temperature heat source for
re-generation of the catalyst bed. Commercial
advice on options to upgrade Speedtronic Mk II control system Commercial
advice on options to upgrade Speedtronic MkIV
control system on MS6001B used for power gen at same location |
|
FIDIC
Contracts Specialist and Contracts Manager on power generation and gas turbine
installation, maintenance and upgrade projects |
Multiple |
Multiple clients and
locations including Shanahan Engineering ( now Ethos Energy), serving the
power generation and oil and gas sectors. |
|
FIDIC
Contracts Specialist; power generation EPC contracts |
MHI Takasago
Japan |
Commercial and technical
advice on successful resolution of multiple warranty and associated claims at
multiple sites under FIDIC Silver Book EPC framework |
|
Biomethane in Transport New Business Development |
Ireland |
Organised Ireland`s first
zero carbon bus journey which took place on Monday, 25th March
2019, which was featured prominently in national print and broadcast media See links; https://www.rte.ie/news/environment/2019/0325/1038431-green-bus-trial/ Route: From Lapp's Quay in
Cork City to the MaREI (Marine and Renewable
Energy) research centre in Ringaskiddy Technology: A
biomethane-powered ("biogas") bus running on renewable gas
generated from agricultural and food industry waste Passengers on Board:
Representatives from Cork Chamber, Energy Cork, and the MaREI
/ UCC research center. |
|
Bio LNG and reduction of
boil-off gas flaring |
Ireland |
Developed proposal for bio-LNG
supply to off gas grid users in north-west Ireland Industrial sites would be
supplied via backhaul indigenous biomethane into LNG Terminal. This would
also reduce Boil Off Gas (BOG) flaring |
|
440MW CCGT IPP project
under FIDIC Silver Book |
Ireland |
Commercial and technical
advice on 440MW CCGT IPP - project value EUR407 million. Financed by European
Investment Bank (EIB) Loan of EUR200 million in direct project
finance/long-term debt The remaining EUR200 million
was financed directly by the developer`s corporate resources and commercial
borrowings underwritten by a state backed by utility balance sheet. Plant construction under
FIDIC Silver Book began in March 2008 and was completed on budget and entered
commercial operations in late 2010. Plant consists of a GE
Frame 9FB (PG9371FB) gas turbine on a single-shaft configuration with GE A15
steam turbine with a SSS clutch driving a GE 450H generator. Steam raised in CMI Energy
Heat Recovery Steam Generator The plant features several
Innovative Features Supplementary Firing; in
post-combustion duct burner system designed to fire natural gas or Refinery
Off-Gas (ROG) supplied directly from an adjacent oil refinery Industrial Cogeneration;
facility to export up to 50 tonnes per hour of high-pressure process steam
(at 45 barg) across fence to an adjacent oil refinery GE 450H synchronous
condenser: Generator can be
configured to operate as a synchronous condenser plant can accommodate modification
for a separate SSS clutch to decouple the generator. Reliability Excellence; a
new advanced software solution which taps into industrial-scale data
analytics to predictively identify operational issues before they occur. |
|
Non OEM LTSA from Independent Service
Provider (ISP) |
Multiple International locations |
Commercial and technical
advice on evaluating and negotiation of multi-year gas turbine LTSA.
Facilitated transition from an Original Equipment Manufacturer (OEM) to a tier-1
Independent Service Provider (ISP) Savings delivered
typically 20% to 35% over OEM LTSA Developed commercial
arrangements for migration of one of the first OEM LTSAs to ISP LTSA at a
power and desalination plant in Abu Dhabi UAE. Negotiated contract with
non-OEM LTSA service provider Negotiated certified
refurbished parts supply contract for 8 x MS9001E ( PG9171E) gas turbines
which was wrapped with non OEM LTSA, in a fully transparent, flexible and
highly re-negotiable contract |
|
Dispatchable back-up and
peaking power plant generation capacity |
Ireland |
Commercial and technical
advice on developing peaking power plants to support intermittent renewable
generation. Proposal for 90MW
developed based on 2 re-located MS6001B gas turbines. This proposal was
subsequently successfully implemented by a competitor. Proposal then developed
for 200MW of fast response generation capacity based on re-located LM2500 and
LM600 aeroderivative gas turbines. This proposal was subsequently
successfully implemented by the grid operator as the Temporary Emergency
Generation (TEG) project. |
|
Gas Compression &
Flare Reduction Cabinda Gulf Oil Company
(CABGOC) a subsidiary of Chevron |
Cabinda Angola |
Commercial and technical
advice on refurbishment and upgrading of Waukesha L7042GSI engines with
upgraded ESM2 control system. These are heavy duty V16 uniquely engineered to
run directly on variable-quality `field gas` or raw well gas in Cabinda's oilfields.
This fuel flexibility allows CABGOC capture and utilise
associated gas to run heavy duty field pumps and generators rather than
flaring it |
|
Absorption refrigeration
feasibility study |
Ireland |
Feasibility study into
Trigeneration (CHP with absorption refrigeration) for electronics
manufacturing company |
|
Boiler economiser retrofit
feasibility study |
Ireland |
Feasibility study into
retrofitting a 16T flame tube boiler with an economiser |
|
Combined Cycle Gas Turbine
Fuel System Re-Calibration Speedtronic Mk IV |
Edison Thermoelectrical Marghera, Venezia, Italy |
Troubleshooting fuel
valve position fault on start-up. MS 9001E (PG9171E) gas turbine servo valve
replacement and fuel system recalibration Re-configure spinning
reserve control constants |
|
CHP feasibility Study
including feasibility of IGCC with wood waste as fuel |
Ireland |
CHP feasibility study for
modern wood processing plant. Payback analysis based on using natural gas in
CHP plant instead of wood waste in existing water tube boilers. Alternative integrated
gasification combined cycle (IGCC) CHP plant with wood waste as fuel |
|
Conversion of Boilers from
heavy fuel oil (HFO) to natural gas |
Ireland |
Design of gas
distribution system. Preparation of tender specification for pressure
reduction and regulation equipment. PID review, pipework design and sizing. Design of boiler-house gas
detection system |
|
Combined Heat and Power
(CHP) Feasibility Study |
Ireland |
CHP Feasibility study for modern
food manufacturing plant, electrical demand 3 MW(e) Project Value Euro 2.5m |
|
Preparation of Proposal
for 15-year maintenance contract for the Dublin Port Tunnel facility |
Ireland |
Preparation of a detailed
proposal for the 15-year maintenance contract for the mechanical and
electrical equipment |
|
Ireland |
Specification, preliminary design, tender, detail design, and project
management of installation and commissioning of new 16T boiler. Project value
Euro 712 K |
|
|
5 MW(e)Combined Heat and Power (Cogeneration) Project; |
Ireland |
Completed detailed CHP feasibility study, and produced conceptual
design models for possible 5 MW (e) integrated CHP plant. Project Value Euro 9.15 M |
|
Comprehensive Site Energy Survey and Energy Audit |
Ireland |
Comprehensive Energy Audit and Energy Survey carried out to CIBSE AM5 1991
- Energy Audits and Surveys |
|
Project to establish unit costs for all site energy and utilities
usage. |
Ireland |
Pharmaceutical plant energy use survey in preparation for energy
market de-regulation. |
|
Retrofit of 349kW(ref) Refrigeration plant with R134a |
Ireland |
Technical evaluation of all retrofit options Project value Euro 305 K.
|
|
Installation of 530 kW(ref) NH3 Refrigeration plant |
Ireland |
Specification of new plant Project value Euro 800K |
|
Installation of 400 kW(ref) NH3 Refrigeration plant |
Ireland |
Design of tie-ins to existing plant Project value Euro 661K |
|
Feasibility Study on drop in HFC, HCFC and HC replacement gases for
R12 and R22 for large industrial refrigeration plant. |
Ireland |
Evaluation of all possible retrofit options for a 430kW(Ref) R12
Sulzer refrigeration plant with a centrifugal compressor |
|
Feasibility Study and lifecycle cost analysis of 500kW(ref) absorption
refrigeration plant |
Ireland |
Absorption refrigeration at -25oC using gas turbine exhaust waste
heat. Done as follow on from a CHP feasibility study. |
|
Feasibility study on Waste Water Treatment Plant sludge drying using
Gas Turbine exhaust waste heat. |
Ireland |
Study done to evaluate ways of making the subject plants thermal and
electrical load profile more suitable for CHP |
|
Feasibility study and preliminary design of system to process solvent
waste as boiler fuel using existing equipment on site. |
Ireland |
Project to determine the feasibility of burning high calorific value
waste process solvent in a planned future gas turbine waste heat recovery
boiler, or in an existing gas fired flame tube boiler. |
|
Feasibility study on centralised refrigeration plant incorporating ice
/ eutectic storage and waste heat powered absorption refrigeration. |
Ireland |
Energy reduction option in a large chemical plant with a high process
cooling load at -20oC i.e. average cooling load of 3,150 kW (Ref.) |
|
Project to commission an auto-sequence control system on four 530kW
refrigeration plants. |
Ireland |
Project value Euro 44,430 achieving annual savings of Euro 102,922. Auto sequencing of start-up and shutdown avoiding part load operation
on screw compressors. |
|
Development and implementation of Targeting and Monitoring system
(STARK system). |
Ireland |
Implementation of energy target and monitoring system in a large
pharmaceutical plant using existing infrastructure i.e. existing computer LAN |
|
Replacement of 12" process piping headers |
Ireland |
Short turn-around replacement of 160m of 12" process piping
header. Project value Euro 228,563 |
|
Reverse Engineering Repair procedure for cast iron axial pump casings |
Ireland |
Unit Repair cost Euro 1,525 New item cost Euro 8,895 each |
|
Reverse Engineering Repair procedure for cast iron large tank rake
drive bull gear |
Ireland |
Material analysis and development of repair procedure for cast iron
gear. |
|
Reverse Engineering Repair and material selection for pump shaft,
bearing and seal bushings |
Ireland |
Cost savings of Euro 6,362 per year per unit |
|
Pump Selection - replacement of high maintenance multistage gear pumps
with more robust centrifugal items |
Ireland |
Repair cost savings of Euro 5,000 per year per unit |
|
Pump and line sizing for various fluids including viscous slurries |
Ireland |
Pump selection taking into account capital cost, lifecycle costs including
energy efficiency and maintenance costs, and ease of installation. |
|
Development of repair procedures for ASME VIII pressure vessels |
Ireland |
Pressure vessels damaged by stress corrosion cracking. All repairs to ASME VIII |
|
Development of repair procedures for API 650 / API 653 storage tanks |
Ireland |
Erosion and corrosion damage, all repairs to API 653 |
|
ABB Camlica Hydro Electric Power Plant
Constructability review |
ABB, Birr, Switzerland |
Preparation of tender packages for issue to local mechanical and
electrical contractors for the Camlica HEPP,
Turkey. |
|
Petrofina Angola. Re-furbishment and upgrade of the Pangala Gas Lift Station 3 x Waukesha L740GSI gas engines and 3 x Ingersoll Rand 4RDS-3
reciprocating compressors |
Ireland / Soyo, Angola |
Project value US$ 3.6 m Complete overhaul and upgrade of gas lift facility to provide
re-injection for the Perofina / Sonangol Pangala and Quinguila on-shore
fields |
|
Mitsubishi Heavy Industries (MHI) Parana 535MW(e) Combined Cycle power
Plant 4 x MW 701F |
Ireland |
Development of tender packages for local Argentinean mechanical and
electrical erection contractors |
|
Mitsubishi Heavy Industries (MHI) Una CCGT 1 x MW 701DA - Warranty Items |
Maasvlakte, Holland / Ireland |
Low Btu blast furnace gas fuelled unit Technical advice on resolution on miscellaneous warranty / punch-list
items |
|
Mitsubishi Heavy Industries (MHI) Saltend - Contract
Management of consortium partner subcontractor claims 3 x MW 701FA |
MHI, Takasago, Japan |
Investigation and settlement of disputes relating to scope split in
consortium agreement |
|
Long term Maintenance Barking Power Station 5x MS 9001E CCGT |
Ireland / UK |
Proposal for long-term maintenance contract for gas turbines including
repair of hot gas path parts by Wood Group |
|
Preparation of proposal for the erection and commissioning of 1xGE
Stag 106FA |
Ireland |
RWE Opel IPP Germany |
|
GE Fife Energy 1x MS 9001FA - Subcontractor pre-qualification and
selection, Pre-bid meeting and site survey |
Ireland / Fife, Scotland |
IPP on Scottish Coal gasification site Fife Scotland |
|
Austrian Energy Poolbeg 2 x HRSG for Seimens V94.2 conversion to combined cycle. |
Ireland |
Feasibility study into Austrian Energy boiler tube bundle module
fabrication in Ireland. Sourcing of suitably qualified craft labour, Establish costs, and finding suitable locations for the job. |
|
MS
5001M Shop refurbishment, including Major Overhaul and control system upgrade
and refurbishment Speedtronic Mk I control system |
GE Service Shop,
Jacksonville, Florida, USA |
Power block unit conversion to stand alone
unit |
|
MS 5001K Fuel Regulator re-calibration and start-up |
Spain. |
Haagen temperature control |
|
MS 5001N Combustion Inspection, |
Spain. |
Combustion inspection on heavy fuel oil fired unit |
|
MS 5001N Speedtronic Mk II Control system re-calibration and
modifications |
Spain. |
Addition of BOP contact inputs and outputs. Back-plane wiring mod.s for new sequencing. |
|
MS 5001K Fuel Regulator Control system retrofit |
Spain. |
Haagen to Temcon I temperature control
retrofit |
|
MS 6001B Installation and Mk IV Speedtronic Start-up, |
Rhode Island, USA. |
IPP Plant - Pawtuckett Power |
|
MS 5001MSpeedtronic Mk I re-calibration and start-up, |
Springville, Mass., USA |
Unit start-up after major overhaul |
|
MS 5000 Parts Interchangeability Study, and Spare Rotor Program, |
GE Service Shop Basildon, UK |
Study into interchangeability of rotor parts between different model
MS 5001 and also MS 5002 to improve GE rotor exchange service |
|
3 x MS 9001E Exhaust Damper retrofit and exhaust plenum modifications |
Abu Dhabi, UAE. |
Project included retrofit of internal insulation and cladding to GT -
Boiler exhaust duct. |
|
MS 9001E Bearing Inspection, |
Abu Dhabi, UAE. |
Fast turn-around bearing inspection, all bearings
removed without removing the GT rotor. |
|
MS 5002B Speedtronic Mk II to Speedtronic Mk IV Simplex retrofit
troubleshooting |
QGPC, PS3, Qatar. |
AEG Packaged Frame 5 GT installed in Zone 2 enclosure. Compressor drive. |
|
MS 5001E Fuel regulator re-calibration, troubleshooting and start-up, |
Valentia, Venezuela. |
Re-located unit providing heat and power for a paper mill in Venezuela |
|
MS 9001E (PG 9171E) Exhaust Damper Retrofit and Speedtronic Mk IV+
control system |
Abu Dhabi, UAE. |
Project to integrate the control of waste heat recovery boilers with Mk
IV control system. GT Exhaust damper interlock sequencing moved from boiler control
system to GT control system |
|
MS 9001E (PG 9171E) Site residency, Combustion Inspections. Control System Speed Mk IV + |
Abu Dhabi, UAE |
One of the first Mk IV+ sites. |
|
MS 5001K Major overhaul and Control System re-calibration of with Fuel
Regulator control system |
ALPART
Jamaica |
GE MAC temp. control |
|
De-mothballing and commissioning of 6 x LM2500s with Speedtronic Mk IV
control systems. |
Marjan GOSP 2, Marjan Field.
Arabian Gulf, KSA. |
Marjan GOSP 2 - the largest offshore gas compression platform in the
world when built. Full output of 600 MMSCFD (million standard cubic feet per
day) gas at 535 psi (36 Bar), 350,000 BPD (barrels per day) Oil |
|
Start-Up 1 x MS 6001B Speedtronic Mk IV+ control system. |
Port Harcourt, Nigeria. |
Project to provide power for the NNPC / Shell Pt Harcourt LNG terminal |
|
Major Overhaul and control system modifications MS 9001E (9171E) with
Speedtronic Mk IV controls. |
Abu Dhabi, UAE. |
Al Taweelah UAE, one of the largest power
and desalination plants in the middle east. |
|
MS 9001E (9151E) Hot Gas Path inspection, Major Overhaul and control
system re-calibration, Speedtronic Mk II with ITS control system |
Beersheba, Israel. |
Hot gas path inspection developed into major inspection and removal of
compressor stator vanes due to FOD |
|
Start-up MS 9001E (9171E) with Speedtronic Mk V control system. |
Port Dickson, Malaysia |
One of the first IPPs in Malaysia. The first IPP to synchronize with the
grid. Fast track construction schedule |
|
Start-up of 1 x MS 6001B with Speedtronic Mk V control system. |
Miri, Malaysia |
Fast track start-up of simple cycle GT unit in power starved area of
northern Sarawak (Borneo). Project value US$ 16M. |
|
Mk V controls troubleshooting on full load string test of LM 6000
Speedtronic Mk V Control system |
Nuovo Pignone, Massa,
Italy |
First Nuovo Pignone packaged LM 6000. First LM 6000 with Mk V and Woodward fuel system. Generator drive for offshore
application with Hamilton Oil UK. |
|
Resolution of warranty items on 1 x MS 6001B installation, mechanical
and controls, Speedtronic Mk V and Historian |
Miri, Malaysia |
Resolution of punch-list items and problems with integration of new 35